Services

Our Services

Professional Engineering Services You Can Trust

Demolition Services

Safe and controlled demolition solutions for residential, commercial, industrial, and infrastructure projects using advanced equipment and carefully planned execution methods.

Includes

  • Building Demolition
  • Villa Demolition
  • Industrial Demolition
  • Structural Demolition
  • Interior Strip-Out
  • Soft Demolition
  • Concrete Breaking
  • Site Clearance

Shoring Systems

Reliable temporary and permanent earth-retention systems designed to support deep excavations while ensuring structural stability and maximum site safety.

Includes

  • Sheet Pile Shoring
  • Soldier Pile & Lagging
  • Secant Pile Walls
  • Contiguous Pile Walls
  • Anchoring Systems
  • Bracing Systems
  • Excavation Support

Pile Foundation Works

Complete deep foundation engineering solutions that provide superior load-bearing capacity, long-term durability, and structural stability.

Includes

  • Bored Piles
  • CFA Piles
  • Micro Piles
  • Mini Piles
  • Driven Piles
  • Pile Testing
  • Foundation Strengthening

Excavation & Earthworks

Professional excavation services for construction sites with efficient planning, modern equipment, and strict safety procedures.

Includes

  • Bulk Excavation
  • Basement Excavation
  • Earthworks
  • Trenching
  • Site Preparation
  • Backfilling & Compaction

Concrete Cutting & Core Drilling

Precision cutting and drilling services that support structural modifications while protecting surrounding structures.

Includes

  • Wall Sawing
  • Floor Sawing
  • Wire Sawing
  • Core Drilling
  • Concrete Breaking
  • Structural Alterations

Ready to Build with Strength and Confidence?

Partner with GSM for safe, precise, and reliable demolition, shoring, piling, and excavation solutions tailored to your project requirements.

Your trusted partner for demolition, foundation, and construction support services built on quality and safety.

Building Strong Foundations for Every Project

© 2026 GSM Wrecking & Demolition Works Designed & Developed by Tarjeeh.ae